Call us: 0333 240 86 88
Welfare Units < Back to full list

GP360

Eagle icon Call Eagle Plant for more details 0333 240 86 88

It is now an HSE requirement for contractors & employers to provide basic welfare facilities when three or more employees are working in the open.

Always being aware of changes in legislation Eagle Plant has introduced the GP 360, which addresses all these HSE requirements in one easily transportable unit.

Easily towed, the GP 360 is parked at its location and then set down using its unique hydraulic jacks and retracting wheels. Once on the ground the towbar is covered with the integral nose cone for added security.

All these operations can be completed in less than 3 minutes by one person!

The rear of the unit houses a recirculating toilet with hand washing facilities, a drying room and super silenced diesel generator.

The front of the unit is furnished with a kitchen comprising a single stainless steel sink with cold water tap, 20ltr. of fresh drinking water with disposable cup

dispenser, a 20ltr waste water butt, instant hot water hand wash, microwave and first aid kit. Inside surfaces are easily cleaned and maintained during day to day use.

The adjoining rest area includes a table and seating area for up to six people, with electric heater and
remote starting facility for the generator.

As the work area moves, the GP 360 easily moves with it. With only a 3 minute pick up and set down, downtime is reduced to an absolute minimum. Saving both time and money.

Product Specification

  • HSE Compliant
  • One man'3 min Set Down' Operation
  • 6kva 240V Diesel Generator
  • Toilet and Wash Hand Basin
  • Drying Room
  • Single Sink
  • Instant Hot Water
  • Drinking Water
  • Microwave
  • Table and Seating for 6
  • 5 lever deadlocks
  • Eco Friendly GP360 Fusion
  • 12v Electrics

Engine Driven
'On Demand' Battery Charger
Rainwater Harvesting Waste Water Flush
Toilet
Insulated Floor